Six Sigma Yellow Belt Training II

Are you pressed for time and haven’t started working on your assignment yet? Would you like to buy an assignment? Use our custom writing services for better grades. Even if your deadline is approaching fast, our writers can handle your task right when you need it.


Order a Similar Paper Order a Different Paper

A continuation from my week 3 assignment.

Purpose of Assignment

The purpose of this assignment is for students to receive Six Sigma Yellow Belt Training Executing DMAIC Six Sigma quality improvement (analyze, improve, and control) projects.

Assignment Steps

Resources: Microsoft® PowerPoint®

Use the same business you chose (Home Depot improving online services) and has been observing and collecting data for the Week 3 Learning Assignment.

Execute the analyze phase of the Six Sigma DMAIC project including the following:

  • Determine the most likely causes of defects.
  • Understand why defects are generated by identifying the key variables most likely to create process variation.
  • Identify necessary/unnecessary process steps.

Execute the improve phase of the Six Sigma DMAIC project including the following:

  • Identify means to remove the causes of defects.
  • Confirm the key variables and quantify their effects on the critical-to-quality characteristics (CTQs).
  • Identify the maximum acceptance ranges of the key variables and a system for measuring deviations of the variables.
  • Modify the process to stay within an acceptable range.

Execute the control phase of the Six Sigma DMAIC project including the following:

  • Determine how to maintain the improvements.
  • Determine how to monitor and control improvements.
  • Put tools in place to ensure that the key variables remain within the maximum acceptance ranges under the modified process.

*** Important please ensure you a couple of these analytic tools***Utilize all analytical tools available for Six Sigma as permitted or appropriate including, but not limited to: flowcharts, run charts, Pareto charts, checksheets, cause-and-effect diagrams, opportunity flow diagram, process control charts, failure mode and effect analysis (FMEA), design of experiments (DOE) and lean tools. Students can use templates located in the text or online sources.

Develop a 10- to 15-slide Microsoft® PowerPoint® presentation, including talking points (Please included detailed speaker notes), highlighting your work on the three phases of the Six Sigma process improvement project.

Format your assignment as if you would be giving a presentation to senior management (Delivered to SR Management).

Compile the slides from the Week 3 Learning Team Assignment, “Improve and Control Phases,” with your Week 5 slides into a final PowerPoint® presentation to be submitted for final credit.

Click the Assignment Files tab to submit your assignment.

APA Format please

Table of Contents

Introduction

Presentation

Summary or Conclusion

References (2-3) Thanks

Writerbay.net

Most students find it hard to finish papers at some point in their studies. If it ever happens to you, don’t get desperate—we have a service for every writing emergency! Whether you’re stuck with a problem, equation, or a piece of creative writing, we will definitely come to your rescue. Fill in the order form with the details of your paper. Write your personal instructions so we can meet your expectations.


Order a Similar Paper Order a Different Paper